After a great fortnight in Egypt, Jess brought us back to the boat today. Put everything away and lit fire to start warming boat. Even with the stove on high it can take a couple of days to fully warm the boat.
Wasted visits
Saturday, 3 September 2016
Winter 2015/16
We over-wintered on Ceilidh on the Kennet & Avon between Reading and Newbury. Planned winter stoppages (lock closures) were a little harsh in our area meaning effectively we were limited to a length of the navigation between Theale and Woolhampton.
Subscribe to:
Posts (Atom)